FAQ

.



4.1 Preparation

Follow

Before using thread locking compound, if specified, ensure that the mating surfaces are completely oil free and dry.

When reassembling pumps, it is important to use the correct overhaul kit. The relevant kit number can be found in the Service Parts List.

Lightly lubricate all flexible seals and O-rings with clean test oil and external seals with grease before assembly in their respective positions. Always use the correct protection cap when fitting new O-rings.

Refer to the relevant Test Plan for details of special build items and any initial setting instructions.

Refer to Section 6 for all special tools, protection caps and torque values.

The direction of rotation of the pump is as viewed from the drive end.

Have more questions? Submit a request

Comments